For phase 1 of the Eggleston Housing Project, MMC Development Ltd has tapped seven local contractors to build sixteen (16) three-bedroom homes.
Each structure is a standalone unit, with the following features:
- One master bedroom with master bath
- Two standard bedrooms
- One sharing toilet and bath
- Living room
- Dining Room
- Kitchen
- Laundry area
Eggleston
Dominica
Project Location
12 Months